In the 6th section of the second stage, the floor slab of the 5th floor has been cast
September 08, 2021
RIEL Real Estate Corporation reports that the construction of Shengen RC is actively pursued. In the 6th section of the second stage, the floor slab of the fifth floor has been cast. This was announced by the project manager.
In the 8th section, the laying of the 10th floor walls has been completed.
It is also reported that the walls of the eighth floor are being laid in the 5th section, and in the 10th section of the 11th floor.